HONGLONG LEADZM Lamborghini Poison Small Dual Drive 12V 4.5AH with 2.4G Remote Control Sports Car Pink

$98.00$101.50

16 sold in last 12 hours
Hurry! Over 7 people have this in their carts
  Hurry up! Sale end in:
+
  •  Delivery & Return

    Delivery

    Store delivery FREE
    1-3 working days
    Home or collection point from $79.00 FREE
    On all your orders for home or collection point delivery

    Returns

    Return
    We will accept exchanges and returns of unworn and unwashed garments within 30 days of the date of purchase (14 days during the sales period).
    Returns in store FREE
    Your return will usually be processed within a week to a week and a half. We’ll send you a Return Notification email to notify you once the return has been completed. Please allow 1-3 business days for refunds to be received to the original form of payment once the return has been processed.
  Estimated Delivery: Oct 10 – Oct 14
  ... people are viewing this right now
Guaranteed Safe Checkout

Manufactured under official license from Lamborghini. Astm-certified. The licensed Lamborghini Veneno comes with bright headlights and realistic taillights. Looks like the real model.  With high quality material. Parents can let their child drive manually or use the remote control to safely guide them when necessary. Your children will feel like they are driving a real car with powerful rear motors. It is safe and durable enough for your child to play. Adjustable seat belt for safe and comfortable use. This toy will be your best choice! 

Specifications:

Color: Pink /Green/Black

Material: PP Plastic. Metal

RC Mode: 3 Speeds Options

Manual Mode: 2 Speeds Accessible

Max User Weight: 66 Lbs (30kg) 

Max Speed: 4.3 mph

Charge Time: 8-12 Hrs.

Run Time: 1-2 Hrs.

Battery Type: 12V

Controller Battery: 2 x AAA Batteries (not included)

Dimensions: 44(L) x 24(W) x 18(H)

Recommended for Ages: 3-6 years. one rider

Package Included:

1 x Electric Car

1 x 2.4G Remote Control 

1 x Charger 

1 x Manual

Feature

High-quality PU wheels can adapt to a variety of ground

Non-slip EVA scooter with built-in brake system ensures safer riding

Suitcase with inner pockets can store books. snacks. clothes. etc

Comfortable handles are easy to control the direction

Attractive pattern and colorful lights stimulate kids’ interest

Easy to fold within 4 steps for a more space-saving size

Waterproof and scratch-resistant suitcase will last for a longer time

Proper size is approved by airplane and suitable for multiple occasions

The perfect gift for children over 5 years old to develop their adventure ability

  • This electric car designed with wider seat and adjustable seat belts which ensure children’s safety and comfy experience
  • Equipped with LED headlights. horn and engine sounds. and hydraulic powered doors that swing open just like the real Lamborghini
  • 2.4G remote control with 3 different speed modes. And parking mode. forward/reverse functionality.
  • 12V rechargeable battery that can be charged fully within 8-12 hrs. offering hours of playtime adventures for your kid. And speeds of 4.3 mph. Weight Capacity: 66 lbs
  • Parents can let their child drive manually or use the remote control to safely guide them when necessary

Specifications

Brand HONGLONG
Age Range 3 – 6 Years
Vehicle Type Lamborghini ride on Car
Seating Capacity 1
Color Pink
Battery Capacity 4.5 Ah
Assembled Product Dimensions (L x W x H) 44.68 x 23.22 x 11.61 Inches
Actual Color

Black, Pink

Based on 0 reviews

0.00 Overall
0%
0%
0%
0%
0%
Be the first to review “HONGLONG LEADZM Lamborghini Poison Small Dual Drive 12V 4.5AH with 2.4G Remote Control Sports Car Pink”

Your email address will not be published. Required fields are marked *

Write a review

Reviews

There are no reviews yet.

✨Limited time offer this week✨

Free shipping on orders over $59

       30-day hassle-free returns
        Full refund within 1-2 week of return receipt
       Covers any possible defects in materials and workmanship
      Enjoy free shipping on orders over $59.

SKU: HONGLONG LEADZM Lamborghini Poison Small D12140752dTkryN Category:  Tags: ,
Close
Close My Cart
Close Wishlist
Close Recently Viewed
Close
Compare Products (0 Products)
Compare Product
Compare Product
Compare Product
Compare Product
Close
Categories